OFFSHORE / PROJECTS
MV Athena
Euro Demolition was solely responsible for the complete removal of the MV Athena, a supply vessel built in 2006, which sank off the coast of the Republic of Congo. The vessel was 86 meters long, weighed over 4,000 metric tons, and lay up to a depth of 22 meters.
› view images
Karachi
The removal of two collapsed reinforced concrete berths in Karachi sea port in Pakistan. Euro Demolition removed the 40,000 metric tons reinforced concrete up to a maximum depth of 20 meters.
› view images
MV tricolor
The removal of the MV Tricolor, a vehicle carrier with a length of 190 meters. Contracted by Smit Salvage, Euro Demolition was responsible for clearing the seabed of smaller debris and cargo around the wreck with a Liebherr 895 and 22 tonnes orange peel grab.
Rokia Delmas
The removal of the Rokia Delmas, a RoRo Carrier that sank off the coast of La Rochelle, France. Euro Demolition's task was to cut the vessel in hoistable pieces of max. 1500 metric tons.
› view images
MSC Napoli
The removal of the MSC Napoli, a container carrier with a length of 275 meters. As subcontractor Euro Demolition was responsible for the removal of the upper structure of the vessel.
› view images
New Flame (Gibraltar)
Euro Demolition was subcontracted by Titan Salvage to remove the complete cargo (scrap metal) making use of two Liebherr 895 crawler cranes equipped with both a 10 Mt underwater magnet and a 22Mt orange peel grab.
› view images
Stema barge (Wadden sea)
Euro Demolition successfully unloaded the cargo of this grounded barge, thereby enabling Multraship to successfully refloat the vessel.
Dover/Honfleur/Kennacraig
Contracted by Herbosch-Kiere Euro Demolition was responsible for the complete removal of a steamship, tug and barge all dating from the beginning of the 20th century.
› view images
- Euro Demolition Offshore is awarded the...12 January 2012
- Completion of Montecristo refit15 August 2011
- Completion of Hannover Messe Demolition25 July 2011
