OFFSHORE / PROJECTS

New Flame (Gibraltar)

Euro Demolition was subcontracted by Titan Salvage to remove the complete cargo (scrap metal) making use of two Liebherr 895 crawler cranes equipped with both a 10 Mt underwater magnet and a 22Mt orange peel grab.

← back to Projects